Nominate Us
Blogroll
- Carpet – Fun on the Floor
- Emergency Preparedness
- Home improvement blog
- Oval Mirrors
- Williams Home Improvement
Archives
- February 2010
- October 2009
- September 2009
- July 2009
- April 2009
- March 2009
- February 2009
- October 2008
Recent Posts
- Getting Help With Your Home Cleaning
- Why Do I Need Home Warranty ?
- Fitting Laminate flooring
- Low Cost Building Materials
- Redecorating Your Home



Fitting Laminate flooring
Preparation
Laminate flooring needs to be fitted onto a solid, level base, ideally concrete, so before you start fitting the boards make sure you fill in any holes or cracks in the floor with mortar, or if the floor is in very bad condition you may need to skim over completely with a self levelling compound (screed). Always allow any repair work to dry completely (at least 24 hours), then cover with a damp proof membrane to protect the laminate boards from any moisture coming up through the concrete floor.
Related Tags
fitting laminate flooring, laminate flooring coming up, , click flooring coming up, i love my laminate floor, fixing laminate flooring that is coming loose at joints, http://www thehousingzone org/fitting-laminate-flooring/, laminate floor humidity, laminate floors swell up, fitting edgings for laminate floors, laminate floor coming up, my laminate flooring is coming up, fitting laminate floor, badly fitted laminate flooring, loose fitting lamanet flooring